本次畢業設計題目玉泉山莊23#樓的招標檔案、施工圖預算及工程量清單三個部分,層數為5層,層高3米,結構型別為磚混結構。本畢業設計由投標檔案的編制、施工圖預算、工程量清單的編制三部分組成。設計的任務是招標檔案的編制、施工圖預算和工程量清單的編制,其核心部分與首要工作是工程量的計算,在設計過程中,以《建設工程計量與計價》、《工程量清單計價與規則》為依據,按照河北省建築工程工程量清單計價辦法進行,經過指導老師上課的仔細講授與個別答疑,並透過使用查閱資料與網路等手段,在指導老師的幫助下先完成了工程量的計算。
2
回覆列表
  • 1 # 精彩生活源於創造

    buildings of the bidding documents, construction budget and bill of quantities of three parts, layer number is 5, 3 meters high, the structure type for the brick structure. This graduation design by the tender documents preparation, construction budget and bill of quantities of the establishment of three parts. Design task is the compilation of tender documents, and bill of quantities of construction drawing budget establishment, its core part and the priority is the calculation of quantities, in the design process, in order to "construction engineering measurement and valuation"

  • 2 # 情感樂樂樂

    The three part of this graduation design topic Yuquan villa 23# floor of the tender documents, the construction drawing budget and bill of quantities, the 5 layer, the layer is 3 meters tall, structure type for the masonry structure. This graduation design is composed of compilation of bidding documents, the construction drawing budget, engineering quantity list of three parts. The design task is the preparation of tender documents preparation, construction drawing budget and engineering volume list, its core part and the main work is the calculation of the volume of works, in the design process, in order to "construction engineering measurement and valuation", "bill of quantities with the rules" as the basis, in accordance with the Hebei provincial construction engineering quantity list valuation measures, carefully guide the teacher in the class teaching and individual questions, and through the use of access to information and network and other means, in instructs under teacher"s help to finish the calculation of Engineering quantity.

  • 中秋節和大豐收的關聯?
  • 閃亮的結婚鑽戒什麼牌子好?